Change order or remove Rank Bar buttons

You can change the order of the buttons on the Rank Bar (left-hand side of GTX), but you will need to delete the buttons first and then add them back in the order you want.
  1. Hold down the Delete key on your keyboard and click on each button you want to remove.
  2. Click on Setup> Tool Bars.
  3. Drag each button to your desired order (follow the method in the image below).
  4. When you have your setup the way you want, click on Program> Save User Defaults to save the changes.

Rank Bar